Holmesglen Institute
Projects
- #2 Automated tracking of construction materials for improved supply chain logistics and provenance – Phase 1 Scoping Study
- #12 VR/AR technologies in vocational education and training (scoping study)
- #48 Scoping Study for Building the Future – Circular Economy – Shared Interest Project
- #66 Future of construction education
- Light House Project #13: Mixed Reality Carpentry Demonstration
Research themes
- Construction Safety and Wellbeing (2)
- Digital Twins & 3D Modelling (2)
- Supply Chain Management, Logistics (1)
- Artificial Intelligence and Machine Learning (1)
- Digital Project Management (1)
- Circular Economy (1)
- Future of Work & Industrial Relations (1)
- Culture and Diversity (1)
- User Interface, Visualisation and Analytics (1)
- Construction Management (1)
- Building Design and DFMA (1)
- Digital and Automated Fabrication (Robotics) (1)
- Prefabrication & Advanced Manufacturing (1)
Construction Safety and Wellbeing
Theme coordinator
Dr Carol Hon
Projects
Light House Project #13: Mixed Reality Carpentry Demonstration
#29 Real-time EH&S Intervention to Improve Site Safety (Scoping Study)
#60 Mass Timber Wellness in Workplaces
#32 Acoustic flanking performance of mid-rise light gauge steel (LGS) structures
#12 VR/AR technologies in vocational education and training (scoping study)
Digital Twins & 3D Modelling
Theme coordinator
Dr Kourosh Khoshelham
Projects
Light House Project #13: Mixed Reality Carpentry Demonstration
Light House Project #1: Monash Smart Manufacturing Hub (mSMH) – A Digital Twin Living Lab
#29 Real-time EH&S Intervention to Improve Site Safety (Scoping Study)
#17 The implication of Industry 4.0 for the construction industry: towards smart prefab
#12 VR/AR technologies in vocational education and training (scoping study)
Supply Chain Management, Logistics
Theme coordinator
Dr Wen Li
Projects
#93 US Research Tour 2024: San Francisco and Greater Bay area
#65 European Research Tour 2023: Berlin – Copenhagen – Malmö
Light House Project #7: Platform Delivery of Affordable Housing
#61 Building Productivity – Product, Process, People
#15 Using the Whole Tree for Future Timber-Based Construction – Scoping Study
Artificial Intelligence and Machine Learning
Theme coordinator
Dr Buser Say
Projects
#85 From Digital Design to Human Robot Collaborative Masonry Construction
Light House Project #28: The application of computer vision to measure productivity and enhance safety on construction sites
#53 Process Engineering, and Design and Estimating Automation of Fleetwood’s Product Platform
#50 Development of Artificial Neural Network and Automated Life Cycle Assessments for Cloud Based Residential Energy Estimations
#29 Real-time EH&S Intervention to Improve Site Safety (Scoping Study)
Digital Project Management
Projects
#93 US Research Tour 2024: San Francisco and Greater Bay area
Light House Project #28: The application of computer vision to measure productivity and enhance safety on construction sites
Light House Project #7: Platform Delivery of Affordable Housing
#61 Building Productivity – Product, Process, People
#17 The implication of Industry 4.0 for the construction industry: towards smart prefab
Circular Economy
Culture and Diversity
Theme coordinator
Dr Gillian Matthewson
Projects
#66 Future of construction education
User Interface, Visualisation and Analytics
Theme coordinator
Dr Barrett Ens
Projects
Light House Project #13: Mixed Reality Carpentry Demonstration
Light House Project #1: Monash Smart Manufacturing Hub (mSMH) – A Digital Twin Living Lab
#29 Real-time EH&S Intervention to Improve Site Safety (Scoping Study)
#46 Data analytics for structural fibre resources optimisation
#17 The implication of Industry 4.0 for the construction industry: towards smart prefab
Construction Management
Theme coordinator
Dr Mehrdad Arashpour
Projects
#68 Development of a solution for high-rise mass timber residences through a Post & Plate system – Phase 1 feasibility study
Light House Project #7: Platform Delivery of Affordable Housing
#21 Regulatory Reform for Industrialised Building
#61 Building Productivity – Product, Process, People
Light House Project #13: Mixed Reality Carpentry Demonstration
Building Design and DFMA
Prefabrication & Advanced Manufacturing
Projects
#93 US Research Tour 2024: San Francisco and Greater Bay area
#68 Development of a solution for high-rise mass timber residences through a Post & Plate system – Phase 1 feasibility study
Light House Project #7: Platform Delivery of Affordable Housing
Light House Project #13: Mixed Reality Carpentry Demonstration
Light House Project #3: NCHA Independent Living Lab
Collaborative partners
- Monash University (5)
- Master Builders Association Victoria (4)
- Lendlease Digital (3)
- Sumitomo Forestry Australia (3)
- The University of Melbourne (3)
- Victorian Building Authority (3)
- Ynomia (3)
- BlueScope (2)
- Queensland University of Technology (2)
- A.G. Coombs (2)
- Fleetwood Australia (2)
- Salesforce.com, Inc. (1)
- Donovan Group (1)
- Hyne & Son (1)
- uTecture Australia (1)
- VIRIDI Group (1)
- Verton (1)
- Populous (1)
- Stockland (1)
- Nexans (1)