#71 Automated decision making for interdisciplinary coordination during early-stage building design

This project aims to develop algorithms and techniques to facilitate and streamline the spatial negotiation that originates from coordinating building systems throughout the different stages of the building design process. The hope is that building design teams can use these techniques to make informed decisions when developing a building design, which in turn should improve performance and reduce time and cost.

Project team: Dr Victor Bunster, Dr Camillo Cruz Gambardella, A/Prof. Duncan Maxwell, Prof. Peter Stuckey, A/Prof. Guido Tack, Dr Allen Zhang, Tim Butler, Vidish Iyer, Bryon Price, Research Fellow (TBC) and Research Assistants (TBC)