#53 Process Engineering, and Design and Estimating Automation of Fleetwood’s Product Platform
This project aims to improve Fleetwood’s business by digitising the physical components and assets of their product platform, and automating their design and estimating processes, procedures and workflows. Expected operational benefits for Fleetwood include more efficient material use and production time, competitive market bidding and ease of installation while also minimising cost.
Project team: Dr Abdallah Ghazlan, Dr Camilo Cruz, Associate Professor Tai Thai, Dr Victor Bunster, Professor Tuan Ngo, Professor Nelson Lam, Dr Duncan Maxwell, Dr Yousef Alqaryouti, Research Assistant (TBA)
Date commenced and duration
October 2023, 18 monthsLead researcher
Digitalisation
Computational Design
Theme coordinator
Dr Abdallah Ghazlan
Projects
#71 Automated decision making for interdisciplinary coordination during early-stage building design
#95 The Homes NSW MMC Program
#53 Process Engineering, and Design and Estimating Automation of Fleetwood’s Product Platform
#32 Acoustic flanking performance of mid-rise light gauge steel (LGS) structures
#59 Innovative Steel–Timber–Concrete Composite StrongFloor
Artificial Intelligence and Machine Learning
Theme coordinator
Dr Buser Say
Projects
#85 From Digital Design to Human Robot Collaborative Masonry Construction
Light House Project #28: The application of computer vision to measure productivity and enhance safety on construction sites
#53 Process Engineering, and Design and Estimating Automation of Fleetwood’s Product Platform
#50 Development of Artificial Neural Network and Automated Life Cycle Assessments for Cloud Based Residential Energy Estimations
#29 Real-time EH&S Intervention to Improve Site Safety (Scoping Study)
Platforms and Process
Theme coordinator
Dr Duncan Maxwell
Projects
#95 The Homes NSW MMC Program
#93 US Research Tour 2024: San Francisco and Greater Bay area
#53 Process Engineering, and Design and Estimating Automation of Fleetwood’s Product Platform
#61 Building Productivity – Product, Process, People
Light House Project #6: Malvern East Apartment Development
Keywords
- Automation Workflow
- BIM
- Computational design
- Design and estimating process
- Digital assets
- Revit-dynamo