Spark – North East Link
The Spark North East Link Design & Construct Joint Venture (Spark NEL D&C JV, or Spark) is delivering the North East Link Program’s primary package (North East Link Tunnels), including 6.5km of three-lane twin road tunnels to provide the missing transport link between the M80 and the Eastern Freeway.
Spark comprises several construction, commercial and other partners, with the primary construction partners being Webuild, CPB Contractors, GS Engineering & Construction, and China Construction Oceania.
Projects
Research themes
Building Materials & Systems
Theme coordinator
Dr Rackel San Nicolas
Projects
#105 Blockchain-powered peer-to-peer energy trading: Advancing sustainability and affordability in smart residential communities
#84 Feasibility study of recycling excavated clay materials in full-scale concrete applications
#86 Sustainable 3D printed concrete for bespoke infrastructure
#95 The Homes NSW MMC Program
#85 From Digital Design to Human Robot Collaborative Masonry Construction
Sustainable Materials & Products
Theme coordinator
Dr Philip Christopher
Projects
#84 Feasibility study of recycling excavated clay materials in full-scale concrete applications
#86 Sustainable 3D printed concrete for bespoke infrastructure
#95 The Homes NSW MMC Program
#93 US Research Tour 2024: San Francisco and Greater Bay area
#65 European Research Tour 2023: Berlin – Copenhagen – Malmö
Prefabrication & Advanced Manufacturing
Projects
#84 Feasibility study of recycling excavated clay materials in full-scale concrete applications
#95 The Homes NSW MMC Program
#93 US Research Tour 2024: San Francisco and Greater Bay area
#68 Development of a solution for high-rise mass timber residences through a Post & Plate system – Phase 1 feasibility study
Light House Project #13: Mixed Reality Carpentry Demonstration